I was happy Collaborate user.
I migrated to Plastic SCM.
I'm sorry, this just isn't for me.
I'm changing a prefab, and then I get "Version Control: an existing checkout operation has locked the workspace". I didn't press any buttons. I have 1 developer in the team. I didn't do a single change anywhere.
I close the editor and don't get that error, until at some point I get it again.
So, I do not want to be a "compatibility/migration/beta tester" for Plastic SCM.
Maybe I'm too dumb for...
How to remove safely remove Plastic SCM?
I migrated to Plastic SCM.
I'm sorry, this just isn't for me.
I'm changing a prefab, and then I get "Version Control: an existing checkout operation has locked the workspace". I didn't press any buttons. I have 1 developer in the team. I didn't do a single change anywhere.
I close the editor and don't get that error, until at some point I get it again.
So, I do not want to be a "compatibility/migration/beta tester" for Plastic SCM.
Maybe I'm too dumb for...
How to remove safely remove Plastic SCM?